PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Welding clips along the column at the North Elevation (2nd Floor) (800x600).jpg Continued installing duct work at the 1st Floor Facing North (800x600).jpg Electrical conduit at the 2nd Floor Facing West (600x800).jpg Electrical conduit at the 3rd Floor Facing West (600x800).jpg Fireproofing the 2nd Floor Facing West (800x600).jpg Installed copper pipes above the cealing at the 1st Floor Facing North (800x600).jpg Installing copper piping at the 1st Floor Facing West (800x600).jpg
Previous pageNext page Electrical conduit at the 2nd Floor Facing West (600x800)
Electrical conduit at the 2nd Floor Facing West (600x800)